We'll be updating this page regularly with a new video to demonstrate progress in constructing the new CTS.
Construction Phase 1 ("Work Package 1")
The three PDFs shown below are aspects of the first phase of construction.
Page 1 is the overall site grading.
Page 2 is the water line layout.
Page 3 is the sewer line layout.
Construction Phase 2 ("Work Package 2")
The four PDFs shown below are aspects of the second phase of construction.
Page 1 is a rendering of the tipping building steel framing and concrete foundations.
Page 2 is a plan drawing of the transfer station building foundations.
Page 3 is a section drawing through the tunnel of the transfer station.
Page 4 is an isometric view of the foundations, tunnel, ramps and steel framing of the transfer station building